Encana wants TF Insert in Permian Basin

Encana first discovered the efficiencies of the TF insert after a flow run demonstration at the Lubbock Artificial Lift Short Course in May of 2017. After presenting to Entire Engineering Group in September 2017, TF inserts will eventually be going down all Encana's wells moving forward. Quote from one of Encana's Lead Production Engineer, "I don't see a reason why we shouldn't be using these in all of our 1,200 wells in the Permian Basin". "Lets start getting them downhole right away!".


Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square